Business case for East Grampians Health Services to reduce its power costs through the installation of solar PV. Includes assessments of alternative energy sources, recommendations and funding strategy.

This business case proposes installing a 2,000 kW (2 MW) wood chip fuelled steam boiler to replace the current gas fired steam boiler and provide sufficient heat to replace most or all of the natural gas used in the dryers.

Business case analysis for a woodchip supply enterprise investigating the biomass market, the distribution network, the financial viability and the technical and legal requirements.

Feasibility study for an aquatic centre recommending biomass and solar PV to reduce gas heating and electricity costs. Relevant to local government.

Draws on key findings of 6 reports about feasibility of biomass heating for a fitness centre, highlighting financial & efficiency considerations for installing a biomass heating system. Relevant to local government.